May 2015 – October 2015: Our task was to watch over and control the production of steel construction elements for the Kallhall project. Skantest control included:
UT 10% on whole construction + 100% on butt welds,
MT 25%..
View the embedded image gallery online at:
https://www.skantest.eu/en/skantest-projects/17-kallhall#sigProGalleriab54905e726
https://www.skantest.eu/en/skantest-projects/17-kallhall#sigProGalleriab54905e726