The steel construction of a train bridge to Denmark consisting of 19 segments with a total weight of 3 500 tons.
The duration of the project: from January to September 2015.
The scope of our works was all the NDT-tests required by the norm for constructions in class: EXC4 + extra tests and tests of joints made during the assembly in Denmark. .